Dubai Mall – General Washroom Refurbishment
Client: Emaar Properties PJSC
Consultant: Mirage Leisure and Development
Main Contractor: Dutco Interiors (a division of Dutco Construction LLC)
MEP Contractor: Ever Rise Electromechanical Works LLC
Project Duration: 9 Months (Jan 2024 – Sep 2024)
Located within one of the world’s most iconic shopping destinations, the General Washroom Refurbishment project at Dubai Mall redefines premium visitor experience through a full MEP overhaul. Ever Rise Electromechanical Works LLC was entrusted with the turnkey execution of MEP services, ensuring modern comfort, energy efficiency, and compliance in high-footfall areas.
The scope of work included:
- Drainage and Water Supply Networks
- Power Distribution and Lighting Systems
- Chilled Water (CHW) Piping and Air Ducting
- Fire Fighting and Fire Alarm Systems
- Audio-Visual (AV) Infrastructure and Lighting Control Systems
Working under the direction of Mirage Leisure and Development and in close coordination with Dutco Interiors, Ever Rise delivered precision-focused engineering while minimizing disruption to mall operations. The result is a set of seamlessly upgraded washroom zones that reflect Dubai Mall’s commitment to world-class standards in comfort, hygiene, and smart building integration.
